The electricity connection which is taken by the consumer for agricultural work is called private tube well (PTW) connection. In this type of connection, if the connection is taken within 40 meters from the nearest pole, it can also be given through cable. But if the distance from the nearest pole or transformer is more than 40 meters, it is mandatory to give that connection by making an LT or HT line. In some divisions, it is mandatory to take a connection with a new transformer.In this we will discuss about UPPCL New Electricity Connection Charges Tubewell in detail.
PRIVATE TUBEWELL ESTIMATE CALCULATOR
In this Estimate Calculator, the applicant has to write the distance of the connection point from the nearest pole, enter how much HP load the connection is to be taken and select the requirement of the transformer.
PTW line and transformer cost
Transformer Requirement for Tubewell Connection
Generally, it is forbidden to take PTW connection from the public transformer. But if a nearby transformer is available that is already installed under the deposit scheme, then the cable connection can be given from that transformer. But the connection of PTW to the public transformer is forbidden by UPPCL.
For PTW connection of 3 hp, a transformer of 10 kVA, and for PTW connection above 5 hp, a transformer of 25 KVA is to be taken. The connection of 3hp is in single-phase, hence the single-phase transformer is needed. Therefore a transformer of 10 kVA is taken for 3 hp. Similarly, due to the 5 hp transformer being in 3 phases, it becomes mandatory to use a transformer of a minimum of 25 kVA. The minimum rating of the transformer is 25 kVA that is used in a 3 phase supply.
UPPCL New Electricity Connection Charges Tubewell
IN UP state UPPCL New Electricity Connection Charges Tubewell or Electricity connection charges for cable connections are as follow.Here cable connection means, in such type of connection there is no need of transformer and line construction.
निकटम पोल से कनेक्शन पॉइंट की दुरी ४० मीटर से होने पर लाइन निर्माण की आवश्यकता नहीं होती है।
New Electricity Connection Charges for Tubewell UP
LOAD | NEW CONNECTION CHARGE |
3 HP | 2340 |
5 HP | 2940 |
7.5HP | 7307 |
11 HP | 8357 |
13 HP | 8957 |
15 HP | 9557 |
13 hp ka tubwell connection lena h.. What lmv required nd what is Security nd mere khet se 200 mtr dur 11000 ki line ja rhi.. To total kitna kharcha aayega… Pls reply me
bhai if you are from U.P then you have to pay for material and then collect from store(extra loading unloading charge + vehicle charge=4750) and after pole and transformer reached your home then you have to become an electrican (khud pole lagao or line khud bichao) no responsibility of uppcl even after pay 150000 ptw. yeh sb pay krne k baad bhi 20000 additional charges
ptw connection ka estimate me labor charge nhi liya jata hai. esliye consumer ko khud pole ka carriage aur line construction ka charge bhi consumerr ko khus babana hota hai.
Sir ,We need 3hp tubewell connection tell me about cost and monthly bill charge
255 rs per month fixed. there is no unit rate in the tubewell connection. it is fixed on 65 rs/hp rate.
Ptw conction kaise le
click on this link
https://ptw.uppcl.org/online/account/login
Sir hamko 25 day online kiye ho gaya h status kaise check kare
Mere khet se pole ka distance 10 meter hai aur jo transformer hai us per 4 connection hai aur muje new connection ki jarurat hai aur 7.5 Hp ki motor chalani hai to kitne ka charges lagega
sir tubell ke liye nya connection 3hp moter kheti ke liye chahiye pole kee duri 20 MTR ha Kitana amount lagega
cable connection around 2500 rs
सर मै गाजीपुर जिला से हू मुझे सिंचाई के लिए 2hp का कनेक्शन लेना है 4पोल की दूरी है टॄसफामर कितना सटीमेट बनेगा
Mere khet se 600mtr ki duri hai Mera total Kitna kharcha hoga
3 HAP SINGLE PHASE CONNECTION LENA HAI POLE DISTANCE 70M KITANA ESTIMATE LAGEGA 1 POLE KE LIYE AUR SAAT ME WIRE AUR JO BHI SAMAN AUR 2 STAY WIRE.
3 HP SINGLE PHASE CONNECTION LENA HAI POLE DISTANCE 70M KITANA ESTIMATE LAGEGA 1 POLE KE LIYE AUR SAAT ME WIRE AUR JO BHI SAMAN AUR 2 STAY WIRE.